Samples 0

Your sample cart is empty

Free samples of all our products are available for you to order, simply add to cart

View All Products

Request a quote

Submit your quote below and we'll get in touch with you as soon as we can.

Request A Quote

Group Fire Rating Calculator

WHAT OUR CLIENTS ARE SAYING

'That kind of support makes a big difference on site'

1. Value Engineering: Your team’s value engineering approach was incredibly effective. It allowed us to stay within budget without compromising the design intent, which is a rare balance to strike. The end result still feels premium and well-considered

2. Single Supplier & Invoice: Ordering through one supplier with a single invoice made the process much more streamlined. It reduced admin overhead and helped us stay focused on delivery and execution rather than paperwork.

3. Team Support: I felt well-supported throughout the project. Any time a question or issue came up, your team was responsive, proactive, and genuinely collaborative. That kind of support makes a big difference on site.

4. Scheduling, Logistics & Communication: Everything was well-coordinated. Clear communication and thoughtful scheduling helped things run smoothly, and it was evident that logistics were planned with the site team in mind. It made our job easier and kept momentum up.

CompanyAPA Monet
RoleGeneral Manager
Project
Date26th August 2025
Having a single supplier for it all made coordination a lot simpler.

We’ve worked with Decor Systems across a couple of major projects now, including St Augustine’s College and, more recently, the Hymba Yumba College and each time they’ve delivered in terms of service, product quality, and reliability.

At Hymba Yumba, we were responsible for installing Jenna Lee’s Seeds artwork, a detailed, culturally significant piece. The installation went smoothly as everything was clearly labelled, pre-cut, and accurate to the drawings. We didn’t have to make changes or chase information, which saved a lot of time on site.

Communication with the Decor team was consistent and quick. Whether it was confirming delivery dates or answering install queries, their team was always on the ball. The panels were delivered exactly when they said they would be, which helped us stick to our program without delays.

Their understanding of the project’s ESD and Green Star requirements also made compliance straightforward; it was clear they had thought through the materials and certifications upfront.

Having a single supplier for it all made coordination a lot simpler. One point of contact, one invoice, one delivery plan — it streamlined the whole process and gave us confidence that everything would align across the different spaces.

We’ve had a great experience working with Decor Systems and we’re looking forward to collaborating with them on future projects.

- Joshua Schauer

CompanyXclusive Interiors
RoleDirector
Date2025
The combination of ease of installation and superior crack resistance made the Vogl plasterboard ceiling a preferred choice for maintaining both performance and aesthetic appeal.

The installation of Vogl plasterboard ceilings throughout the project was notably efficient, thanks to the system's ease of installation.

The high-quality materials contributed to excellent crack resistance, ensuring a durable finish that met our standards. Additionally, short lead times were achieved, which kept the project on schedule.

The combination of ease of installation and superior crack resistance made the Vogl plasterboard ceiling a preferred choice for maintaining both performance and aesthetic appeal. - Sunshine Contracting’s Project Manager, Alen Vejzovic


CompanySunshine Contracting
RoleProject Manager
Date27/08/24
The process was smooth, with the system's modularity allowing for efficient installation.

The installation of the Arktura ceiling was a pivotal moment in the project, transforming the main entrance space with its sleek design and precise engineering. Throughout the project lifespan, the ceiling added aesthetic value and enhanced the acoustic and environmental quality, meeting all our expectations. The process was smooth, with the system's modularity allowing for efficient installation, ensuring that timelines were adhered to without compromising quality. - Sunshine Contracting’s Project Manager, Alen Vejzovic

CompanySunshine Contracting
RoleProject Manager
Date28/08/24
Installation of their products was a breeze

Working with Decor Systems on the Bower Tree project was efficient and reassuring.

From initial design to final installation of panels, they were by our side and pulled no punches in assistance. Installation of their products was a breeze and we will be definitely looking to their team for future projects.

- Evan Weaver - Director, EFW Interiors

CompanyEFW Interiors
RoleDirector
Date2023
Thanks to the Decor team's hard work

We loved working with Decor Systems on the Baldivis Sports Complex project. They did an amazing job with their DecorZen and Seamless Vogl ceiling and Acoustic wall linings.

We appreciate Decor’s R&D team's efforts in creating custom samples and colours. The project has almost 16 million holes!

Thanks to the Decor team's hard work and partnership with SITE Architecture Studio. We hope to collaborate with you on the next project

- Anjalee Patel - Interior Architect + Urban Designer, Site Architecture

CompanySite Architects
RoleArchitect
Date2023
Mat was fantastic to work with

I can just say that working with Mat was fantastic, and we appreciate the Decor Team's efforts on making it happen!

- Chloe Meagher, Project Leader + Senior Interior Designer - AMC Architecture

CompanyAMA Architects
RoleArchitect
Date2023

“The efforts of the whole team at Decor are greatly appreciated. You guys have gone above and beyond for us. Many thanks!”

CompanyMotyl Shopfitters
RoleContractor
Date2022

You guys are legends.

- Christopher Peck

RoleArchitect
CompanyAOA Christopher Peck
Date2023

Decor Systems provided excellent customer service right the way through the ATSC project. A thorough shop drawing service enabled a smooth installation process to be completed onsite.

Additional panels and infills outside the original scope were manufactured and sent to the site to ensure there were no delays with the completion of panel installation.

- Jay Johnson

RoleSenior Construction Manager
CompanyBadge
Date2020

Thanks for the fastest response time in history!

- Harriet O'Reilly

RoleHarriet O'Reilly
CompanyBuchan
Date2021
Load More